NETWORK / POWER OVER ETHERNET

Leave power for the real world.

Add the maximum device loads, reserve headroom and check your switch budget and powered ports in one view.

Built for installers.
Useful before the first cable.

FREE TOOL · NO SIGN-UP

Installation planner

Installation workspace / PROJECT 001

Recommended PoE

145 W

Camera traffic

32 Mbps
All results ↓

The network & power plan

Use maximum power ratings and capacity available to this project.

8 cameras · 4 Mbps each
W

Use the rated maximum, including IR, heaters or PTZ movement.

W total

Combined maximum power of access points and other PoE devices.

ports

One powered port per additional device; uplinks are separate.

%

Extra power budget above the total device maximum.

W

Total usable PoE output budget, not the switch AC rating.

ports

Powered ports available to this project, excluding reserved ports.

%

Allowance for bursts, protocol overhead and extra traffic.

Mbps

Usable link capacity shared by these camera streams.

Check per-port PoE standards and recorder throughput separately. A capacity PASS does not certify equipment compatibility.

Your project stays in this browser. No account needed.
LIVE PROJECT ESTIMATE

Your system, sized.

1 capacity check needs attention6 of 7 checks pass · estimates, not equipment certification
Storage with margin
12.442 TB

10.368 TB footage + 20% allowance

Camera traffic
32 Mbps

40 Mbps with 25% headroom

Recommended PoE
145 W

116 W devices + 25% headroom

Estimated UPS runtime
73 min

151 W estimated load

Recording capacity

WARNING

345.6 GB/day · 2 TB usable. Estimated retention with margin: 4.8 days (4 complete days); target 30.

Network uplink

PASS

40 Mbps minimum planned capacity. 100 Mbps nominal link suggested. 1,000 Mbps available.

PoE power budget

PASS

96 W cameras + 20 W other devices. 145 W recommended / 150 W available. 34 W above device load.

Powered switch ports

PASS

10 required / 16 available. 6 spare powered ports. Uplinks are separate.

Recorder channels

PASS

8 channels required / 16 available. 8 spare channels. Verify recorder incoming bandwidth separately.

UPS output capacity

PASS

151 W estimated load / 600 W output capacity. Includes 35 W for recorder, switch and losses.

UPS battery energy

PASS

183.6 Wh usable gives approximately 73 minutes; target 30 minutes. Required: 75.5 Wh usable / 88.8 Wh nominal at 85% usable. Validate against the UPS runtime curve.

Decimal GB/TB · Unrounded calculations, rounded display · All results are planning estimates

Ready for the next conversation.

Take your assumptions and results with you.

View plain-text project summary
CCTVPlan — CCTV project estimate
8 cameras · 4 Mbps/camera · 24 recording hours/day · 30 days target retention
Storage: 345.6 GB/day; 10.368 TB footage; 12.442 TB including 20% margin. WARNING
Available: 2 TB usable; estimated retention with margin: 4.8 days.
Network: 32 Mbps streams; 40 Mbps minimum with 25% headroom; 100 Mbps nominal uplink suggested; 1000 Mbps available. PASS
PoE: 96 W cameras + 20 W other devices; 145 W recommended with 25% headroom; 150 W available. PASS
Ports: 10 powered ports required; 16 available. PASS
NVR: 8 channels required; 16 available; 8 spare (negative = shortfall). PASS
UPS: 151 W estimated load, including 35 W recorder/switch/loss allowance; 600 W capacity. PASS
Battery: 216 Wh nominal at 85% estimated usable fraction; 73 min estimated runtime vs 30 min target. PASS
Required battery: 75.5 Wh usable AC energy / 88.8 Wh nominal at 85%.
Decimal units: 1 GB = 10^9 bytes; 1 TB = 1,000 GB. Estimates use a constant average bitrate and maximum device power. Verify VBR peaks, recorder throughput, per-port PoE standards and UPS manufacturer runtime curves. No equipment compatibility guarantee.
01 One connected project02 Instant, browser-based calculations03 Your inputs stay on your device
THE METHOD

Transparent assumptions.
Practical estimates.

Power budget and port count are separate checks

Use maximum device power, including night illumination, heaters and moving parts. Average daytime draw may understate demand when all cameras switch to night mode. The total PoE budget is the switch's available power output to devices, not its AC input rating. A switch can have enough ports but too little total power. Each port must also support the device's required PoE standard and wattage; this planner does not certify per-port compatibility. Reserve uplink ports separately.

Formula / method

Camera PoE W = camera count × maximum watts/camera

Recommended PoE budget W = (camera W + other device W) × (1 + headroom % ÷ 100)

Required powered ports = cameras + other PoE device ports

Units: Mbps = 1,000,000 bits/second; 8 bits = 1 byte. 1 GB = 1,000,000,000 bytes; 1 TB = 1,000 GB. W measures power; Wh measures energy. Values are calculated without intermediate rounding. A displayed estimate is not a guarantee.

WORKED EXAMPLE

Eight cameras at 12 W plus two access points using 20 W total draw up to 116 W at the devices. With 25% headroom, budget 145 W and 10 powered ports. A 120 W switch fails the selected headroom target even though it exceeds the raw 116 W device load.

A FEW USEFUL ANSWERS

Before you specify.

Does total budget prove each port can power a camera?

No. Check the camera and switch PoE standards, per-port watt limits, cable losses and any power allocation rules. Total watts and port count are only two parts of a compatible design.

Should uplinks count as camera ports?

The required port result counts powered devices only. Enter powered ports actually available to the project after reserving any shared uplinks or management connections.

Does the power headroom also increase UPS load?

No. Headroom is reserved capacity, not consumed power. The UPS estimate uses maximum device loads plus your recorder, switch base and loss allowance. It does not add the unused PoE headroom again.